Your browser is out of date.

You are currently using Internet Explorer 7/8/9, which is not supported by our site. For the best experience, please use one of the latest browsers.

banner
Home About Us Our Projects Culvert Soil Stabilization Repair at Vandenberg AFB

Culvert Soil Stabilization Repair at Vandenberg AFB

EagleLIFT saved the Vandenberg Air Force Base $1.5 billion dollars using culvert soil stabilization. Read more about it here. Contact us for more information today!

EagleLIFT Completes Culvert Soil Stabilization Repair at Vandenberg AFB, Saving $1.5B Mission

Overview

In the construction industry, deadlines are a way of life. Whether you are meeting proposal deadlines, managing costs, minimizing weather delays, meeting contract requirements, etc., the clock seems to always be ticking and pressure is continually mounting. However, recently EagleLIFT performed a culvert soil stabilization and slope repair project at Vandenberg AFB that, if not met, the deadlines would be a costly scenario.

Vandenberg AFB is a Department of Defense space and missile testing base located near Lompoc, California. Vandenberg launches a variety of critical rocket missions for military purposes and also leases launchpad facilities to SpaceX. As you can imagine, its activities are high-profile, high-budget, and highly sensitive to delays.

During the 2016-2017 rainy season, Vandenberg experienced extensive storm runoff that damaged an 84 inch, 200ft long corrugated metal drainage culvert, causing collapse at three separate locations and further degraded the culvert’s corroded bottom. The damage to the culvert caused severe inflow and infiltration (I/I) which destabilized an adjacent slope along the main supply road leading to Space Launch Complex 6 (SLC-6).

When an approximate 30ft deep sinkhole opened up by the supply road, a bypass road had to be installed in order to continue launch operations until a permanent fix was designed for the culvert. When concern began to grow that a 20ft high section of the adjacent slope would slip and the sinkhole wound endanger the new bypass road and delay an upcoming $1.5 billion mission, Vandenberg sought for a temporary fix to strengthen the culvert, slope and avert disastrous and costly delays.

Solution

When Vandenberg began designing a repair, the solution was to address 1.) culvert soil stabilization and restoring usable capacity, 2.) ensuring the slope would not slip, and 3.) not impact the environmentally sensitive habitat on the slope.

For the culvert soil stabilization, the AFB determined that chemical grout would be used to stabilize collapsed sections from degrading further into the culvert. The entire culvert was to be stabilized to prevent further soil migration and seal it against further I/I, and the corroded bottom of the CMP would be restored using a flowable fill.

For the slope, a “wedge” injection pattern was designed to provide structural stability at the bottom of the slope and lateral stability to prevent slippage that would cause structural damage to the culvert and irreparable damage to the sensitive environment the slope supports.

“Initially, Vandenberg’s solution for the slope repair consisted of using a compaction grout to provide a dense material for slope stability,” stated Cliff Frazao, Chief Operations Officer of EagleLIFT. “When we were approached for the project we had concern that the compaction grouting footprint could be detrimental to the environmental mission of the project and add too much weight to the area and cause further issues with the culvert.”

Process

Based on these concerns, the slope “wedge” injections were rescoped to utilize a specialized formula of chemical grout that was hydroinsensitive, light-weight and highly expansive. The material’s initial permeation and structural capacity gave Vandenberg confidence in this alternative.

To meet the environmental compliance needs of the project, extensive preparations were necessary to minimize potential delays and protect endangered species that called this site their home. Some of the species included California Buckwheat, El Segundo Blue Butterflies, Tar Plants and the Red-Legged Frogs. To ensure the endangered plant/wild life habitat wasn’t inadvertently violated, environmentalists were onsite to pre-mark the plant life and be on the lookout for wildlife. If any of these species were disturbed or damaged, the project could have seen an immediate shutdown.

In regards to the culvert, EagleLIFT stabilized its entire 200 ft length. At the crushed joints, a 2ft injection of chemical grout created a thick arch of material and densified aggregate. The arch was designed to provide a convex, dense structural layer that would help provide structural stability and reinforcement to the crushed CMP. This would help mitigate further damage from occurring and re-establish limited drainage capacity.

Result

The remaining portions of the culvert were stabilized using a consistent gridded injection pattern. The goal here was to fill any annular voids and restore the bearing capacity of the adjacent support soils.

“This was a high-profile project with an approximate $1.5B mission and national security at stake,” stated Carlos Castillejo, Project Manager for EXBON, the General Contractor for the project. “All eyes were on the EXBON-EagleLIFT Team to complete the project successfully and without delay, something we did with absolute success!”

The terms of the project were to complete the project in a 30-day window, spanning from September 14 – October 14, 2017. The project was completed in 8 days with no delays or adverse environmental impacts.

“We would like to thank both Vandenberg and EXBON for their confidence in EagleLIFT, and we were glad to be a small part of ensuring the missions of our military are executed with the utmost quality and efficiency,” says Donald J. Moody, President and Owner of EagleLIFT. “As a retired USAF Colonel, I take great pride to ensure that EagleLIFT’s operations are top notch especially for our military clients.”

About EagleLIFT

EagleLIFT has offices in Ontario, CA, Concord, CA, Las Vegas, NV and Rialto, CA. EagleLIFT is a Class “A” General Engineering Contractor and holds SB, SBE and DVBE certifications and services California and Nevada.