Home Case Studies Olinda Channel Voidfill - Brea, CA

Olinda Channel Voidfill - Brea, CA

LEARN MORE ABOUT OUR RECENT CASE STUDY ON HOW EAGLE FILLED THE VOIDS OF OLINDA CHANNEL IN BREA, CA.

Project Challenges

• 560 linear feet of drainage channel undermined

• Extent of voids was unknown as city engineers refused DCP testing through the center of the channel in order to avoid puncturing the moisture barrier.

Design Approach

• Injections tubes were installed at 45-degree angles on 4 ft centers

Injection depths of 5’ and 8’ were alternated every 4 feet in order to ensure any existing voids running along the bottom of the channel were also filled.

 

 Project Support

• Sukut Construction provided materials monitoring services for the city

Results

• Voids were filled and probable cracking or extreme settlement of channel was averted