Home Case Studies Metrolink Railroad Stabilization Emergency Repair - Los Angeles, CA

Metrolink Railroad Stabilization Emergency Repair - Los Angeles, CA

EagleLIFT stabilized Metrolink Railroad in Los Angeles, CA. Read more about it here and our other completed projects. Contact us for more information today!

Project Challenges

• 20’X10’ section of track was subsiding due to infiltration of fines into 54” Sewer Main that was below the track.

• The track was in need of emergency repair to ensure the subsidence did not cause the track to avert a potential collapse

Design Approach

• Stabilize the base soils using the EL003 polymer, which has a quick cure time to minimize downtime and was hydro insensitive in case there was standing water.

• Inject at -5’, -10’, and -15’ on 5’ intervals to ensure the upper soil strata was stabilized against subsidence and future soil loss

 

Project Support

• Worked with the contracting maintenance company Transdev

• Coordinated with Metrolink to minimize any impacts to train operations

• Contracted with CCTV contractor to ensure the sewer main was not compromised or blocked by polyurethane

Results

  • Project completed in 2 shifts
  • Onsite within 3 days after a site visit
  • Pre and post DCP tests confirmed an increase in soil density
  • Metrolink was fully satisfied with the professionalism, timely repair, and having no downtime due to the quick cure time of polymer and efficiency of the crew