Project Challenges
• 32' x 25' hinge slabs that were more than 12" in thickness - Average of 7.5" settlement
• Quantity of 13 Slabs
Design Approach
• Identify and design injection points for optimal lift
• Utilize EagleLIFT's polymer to stabilize the weak soils and lift the level of the slabs
Project Support
EagleLIFT worked with the Home Depot team for facility access and scheduling for minimal interruptions to business operations
Results
- Lifted 13 slabs within 1/8" of the original elevation
- Quickly completed the project in 4 shifts
- Mitigated the need to re-pour the slabs, saving time, aggravation, costs, and operational interruption to Home Depot